PROJECT: LONDON CITY AIRPORT Temporary Outbound Baggage System – Complete Electrical Installation 

Project Duration: 10 Months 
Project Value: £1.1m 
 
MEP Project Description: 
Greenfield site installation, testing and commissioning of all Power, Lighting, Fibre, Structured Cabling, CCTV and Access Control systems within a purpose built structure to house a new Std. 3 Baggage Handling System for the airport. 
 
Baggage System Project Description: 
Installation & Testing of a new combined In Gauge and Out of Gauge Baggage Handling System at LCY that will enable the airport to be Std. 3 compliant. The ‘TOBB’ building adjacent to the LCY runway will transport outbound baggage product from check-in to make-up and includes integration of Automatic Tag Reading Equipment, Hold Baggage Screening Machines, Vertical Sortation Units, Vertical Transportation Units and a make-up carousel. 
 
 
 
 
 
 
 
 
 
 

CUZONS LTD 

Mechanical & Electrical (M&E) Contractors 
Kent, London & the South East 
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings