PROJECT: LONDON HEATHROW AIRPORT Terminal 4 Transfer System Std. 3 HBS Upgrade 

Client: Beumer (UK) Ltd 
Project Duration: 4yr 
Project Value: £7m 
Project Description: Installation of a new baggage system within Terminal 2. 
 
Installation of a new transfers baggage system within Terminal 4. The project scope was to decommission and remove the existing HBS system and integrate a new HBS system to ensure DfT compliance without impacting airport operations which remained live throughout. 
 
 
 
 
 
 
 
 
 
 