PROJECT: LONDON HEATHROW AIRPORT Terminal 4 Transfer System Std. 3 HBS Upgrade
Project Duration: 4yr
Project Value: £7m
Project Description: Installation of a new baggage system within Terminal 2.
Installation of a new transfers baggage system within Terminal 4. The project scope was to decommission and remove the existing HBS system and integrate a new HBS system to ensure DfT compliance without impacting airport operations which remained live throughout.