London Heathrow Airport Terminal 4

  • Writer: josh86242
    josh86242
  • Mar 20, 2024
  • 1 min read

Terminal 4 Transfer System Std. 3 HBS Upgrade 


ree


Client: Beumer (UK) Ltd 

Project Duration: 4yr 

Project Value: £7m 

Project Description: Installation of a new baggage system within Terminal 2. 

 

Installation of a new transfer baggage system within Terminal 4. The project scope was to decommission and remove the existing HBS system and integrate a new HBS system to ensure DFT compliance without impacting airport operations which remained live throughout.





 

 
 