London Heathrow Airport Terminal 4
- josh86242
- Mar 20, 2024
- 1 min read
Terminal 4 Transfer System Std. 3 HBS Upgrade

Client: Beumer (UK) Ltd
Project Duration: 4yr
Project Value: £7m
Project Description: Installation of a new baggage system within Terminal 2.
Installation of a new transfer baggage system within Terminal 4. The project scope was to decommission and remove the existing HBS system and integrate a new HBS system to ensure DFT compliance without impacting airport operations which remained live throughout.