London Heathrow Airport Terminal 2

  • Writer: josh86242
    josh86242
  • Mar 20, 2024
  • 1 min read

Direct System Standard 3 Compliance HBS Upgrade


ree


Client: Beumer (UK) Ltd 

Project Duration: 4yr 

Project Value: £7m 

Project Description: Installation of a new baggage system within Terminal 2. 

 

Installation was completed in a phased approach to ensure there was no impact to live operation. The existing system (approx. 1.2km of conveyor) was decommissioned and removed before being replaced with a new system including the integration of 7 no. Std. 3 HBS machines to ensure the airport achieved Std.3 Department for Transport compliance. 




 
 