London Heathrow Airport Terminal 1 & 2

  • Writer: josh86242
    josh86242
  • Mar 20, 2024
  • 1 min read

Enabling Works and Constraints Removal


ree


Client: Beumer (UK) Ltd 

Project Duration: 6 Months 

Project Value: £500k 

Project Description:  

Removal of constraints to enable the installation of the interface of the new baggage handling system to the existing system. Scope included the re-routing and removal of baggage containment and cables. 




 
 